Construction steps of water-based floor paint and the role of each paint

  • Author:
  • Origin:
  • Time of issue:2015-08-18 14:39
  • Views:

Summary:(1) The ground for construction must be smooth and dry;
(2) Apply 1 to 2 two-component sealing primers (the function of the sealing primer is to seal the alkali water vapor on the ground, protect the solid color paint layer, and enhance the adhesion of the paint film to the ground) ;
(3) After the primer is applied and dried for 8-12 hours, apply 1-2 solid-color topcoats (solid-color topcoats can protect the ground and beautify the decoration);
(4) After the topcoat is finished and dried for 24 hours, apply another two-component overcoat varnish (the overcoat varnish can improve the gloss of the floor topcoat, and at the same time has the functions of waterproof, anti-aging and protection of the topcoat) ;
(5) Finally, the floor paint can be put into use after 7 days of maintenance.

Construction steps of water-based floor paint and the role of each paint

(Summary description)(1) The ground for construction must be smooth and dry;
(2) Apply 1 to 2 two-component sealing primers (the function of the sealing primer is to seal the alkali water vapor on the ground, protect the solid color paint layer, and enhance the adhesion of the paint film to the ground) ;
(3) After the primer is applied and dried for 8-12 hours, apply 1-2 solid-color topcoats (solid-color topcoats can protect the ground and beautify the decoration);
(4) After the topcoat is finished and dried for 24 hours, apply another two-component overcoat varnish (the overcoat varnish can improve the gloss of the floor topcoat, and at the same time has the functions of waterproof, anti-aging and protection of the topcoat) ;
(5) Finally, the floor paint can be put into use after 7 days of maintenance.

Information

(1) The ground for construction must be smooth and dry;
(2) Apply 1 to 2 two-component sealing primers (the function of the sealing primer is to seal the alkali water vapor on the ground, protect the solid color paint layer, and enhance the adhesion of the paint film to the ground) ;
(3) After the primer is applied and dried for 8-12 hours, apply 1-2 solid-color topcoats (solid-color topcoats can protect the ground and beautify the decoration);
(4) After the topcoat is finished and dried for 24 hours, apply another two-component overcoat varnish (the overcoat varnish can improve the gloss of the floor topcoat, and at the same time has the functions of waterproof, anti-aging and protection of the topcoat) ;
(5) Finally, the floor paint can be put into use after 7 days of maintenance.

Scan the QR code to read on your phone

language
中国
韩国
韩国
韩国
韩国
韩国

Contact Us

WeChat public account QR code

WeChat

Follow us

Follow us

Headquarter:Address: Room 520, No. 135 (Building 3), Huangyuan Road, Baiyun District, Guangzhou City, Guangdong Province

Production base:No. A-18, Huacai Chemical Paint City, Wengcheng Town, Wengyuan County, Shaoguan City, Guangdong Province

Guangzhou Wuyang Paint Co., Ltd.    粤ICP备14047330号       Powered by:www.300.cn  SEOLabel