Construction steps of water-based floor paint and the role of each paint
- Author:
- Origin:
- Time of issue:2015-08-18 14:39
- Views:
Summary:(1) The ground for construction must be smooth and dry;
(2) Apply 1 to 2 two-component sealing primers (the function of the sealing primer is to seal the alkali water vapor on the ground, protect the solid color paint layer, and enhance the adhesion of the paint film to the ground) ;
(3) After the primer is applied and dried for 8-12 hours, apply 1-2 solid-color topcoats (solid-color topcoats can protect the ground and beautify the decoration);
(4) After the topcoat is finished and dried for 24 hours, apply another two-component overcoat varnish (the overcoat varnish can improve the gloss of the floor topcoat, and at the same time has the functions of waterproof, anti-aging and protection of the topcoat) ;
(5) Finally, the floor paint can be put into use after 7 days of maintenance.
Construction steps of water-based floor paint and the role of each paint
(Summary description)(1) The ground for construction must be smooth and dry;
(2) Apply 1 to 2 two-component sealing primers (the function of the sealing primer is to seal the alkali water vapor on the ground, protect the solid color paint layer, and enhance the adhesion of the paint film to the ground) ;
(3) After the primer is applied and dried for 8-12 hours, apply 1-2 solid-color topcoats (solid-color topcoats can protect the ground and beautify the decoration);
(4) After the topcoat is finished and dried for 24 hours, apply another two-component overcoat varnish (the overcoat varnish can improve the gloss of the floor topcoat, and at the same time has the functions of waterproof, anti-aging and protection of the topcoat) ;
(5) Finally, the floor paint can be put into use after 7 days of maintenance.
- Categories:Painting Knowledge
- Author:
- Origin:
- Time of issue:2015-08-18 14:39
- Views:0
(1) The ground for construction must be smooth and dry;
(2) Apply 1 to 2 two-component sealing primers (the function of the sealing primer is to seal the alkali water vapor on the ground, protect the solid color paint layer, and enhance the adhesion of the paint film to the ground) ;
(3) After the primer is applied and dried for 8-12 hours, apply 1-2 solid-color topcoats (solid-color topcoats can protect the ground and beautify the decoration);
(4) After the topcoat is finished and dried for 24 hours, apply another two-component overcoat varnish (the overcoat varnish can improve the gloss of the floor topcoat, and at the same time has the functions of waterproof, anti-aging and protection of the topcoat) ;
(5) Finally, the floor paint can be put into use after 7 days of maintenance.