Product family
Product family
/
/
/
White Acrylic Exterior Primer

Product Series

cp-8
cp-8

White Acrylic Exterior Primer

Product introduction: This product is a wall primer made of acrylic resin, titanium dioxide, fillers, additives and solvents. Scope of application: It is suitable for surface coating of the exterior walls of residential buildings, office buildings, villas, hotels and other buildings. Packaging Specifications: Valid storage period:
Category
Wall paint
Details

Performance parameters:
Color and Appearance: White, smooth paint film
Surface dry: ≤0.5h
Hard work: ≤24h
Adhesion: ≤Class 2
Flexibility: ≤1mm
Hardness: ≥0.35
 

Product Features:
Excellent alkali resistance, moisture resistance, stain resistance and mildew resistance;
Excellent sealing, preventing the precipitation of water-soluble salts and alkalis, and protecting the topcoat from the erosion of alkaline substances;
Excellent penetration and good adhesion;
Excellent construction performance, can save the amount of topcoat.
 

Construction Instructions:
1. Surface treatment:
    A. Make sure there is no water seepage on the wall, and the water content of the wall is ≤10%;
    B. Remove the old paint film with a steel brush or spatula;
    C. The surface must be clean, free of oil, dry and firm;
    D. The PH of the substrate is less than 10;
    E. The parts with cracks and depressions on the wall should be repaired first, and then polished and smoothed after being thoroughly dried.
2. Construction conditions: When the ambient temperature is lower than 5℃ or the humidity is >85%, please do not construct.
3. Construction method: brushing, rolling or spraying can be used, and the product should be fully stirred before construction.
4. Matching system: primer: Wuyang brand exterior wall primer
             5. Recoating time: minimum interval of 2 hours (temperature 25 ℃, relative humidity 70%).
6. Theoretical dosage: about 10㎡/kg (calculated by one pass), the actual amount of brushing area will vary due to different construction methods and surface roughness. Generally, the number of coating passes is recommended to be 2-3.
 

Notes:
1. The construction site should have good ventilation facilities.
2. Construction workers should wear masks, glasses, gloves and other protective equipment to avoid skin contact and inhalation of paint mist and solvents.
3. Smoking is strictly prohibited on the construction site, and all sources of ignition are isolated.

There is currently no content to display
Please add data record on website background.
language
中国
韩国
韩国
韩国
韩国
韩国

Contact Us

WeChat public account QR code

WeChat

Follow us

Follow us

Headquarter:Address: Room 520, No. 135 (Building 3), Huangyuan Road, Baiyun District, Guangzhou City, Guangdong Province

Production base:No. A-18, Huacai Chemical Paint City, Wengcheng Town, Wengyuan County, Shaoguan City, Guangdong Province

Guangzhou Wuyang Paint Co., Ltd.    粤ICP备14047330号       Powered by:www.300.cn  SEOLabel