Hotline:020-86297777

Web Search: Goods

Your present location:Home >> Product >> Anticorrosive >> CSM paint series >> Chlorosulfonated polyethylene primer (two-component)
  • Product name: Chlorosulfonated polyethylene primer (two-component)
  • Product introduction: From the chlorosulfonated polyethylene resin, modified epoxy resin, preservative pigments, fillers,
  • Applicable scope: For steel structures, pipes, storage tanks, machinery and other equipment can also be used for chemi
  • Packing:
  • Effective storage period: 12 months

Product Features:
Fast drying; high hardness; strong adhesion, good mechanical properties; excellent protection performance, three anti-superior performance; supporting good performance.

Performance parameters:
1, color and appearance: color tone, smooth and smooth film
2, non-volatile: ≥ 30%
3, the proportion: about 1.28kg / L
4, drying time: dry surface ≤ 0.5 hours; hard work ≤ 24 hours (25 ℃ conditions)
5, adhesion (circle law): ≤ 2 level
6, flexibility: ≤ 1mm
7, impact strength: 50kg • cm
8, salt water (3% NaCl, 4d): no blistering, no rust, no shedding, allowing slight loss
9, composite coating resistant to 30% NaOH (30d): no blistering, no rust, do not fall off
10, composite coating resistant to 30% H2SO4 (30d); no blistering, no rust, no shedding
11, composite coating resistant to 30% NaCl (30d); no blistering, no rust, no shedding

Construction instructions:
1, surface treatment: blasting shot blasting, remove the scale, rust, oil, up to Sa2.5 or St3 level.
2, substrate temperature: higher than the dew point 3 ℃.
3, coating method: brush, roller, spray.
4, thinner: chlorosulfonated polyethylene paint special diluent to the appropriate viscosity to use.
5, the thickness of the coating: the general coated two times is appropriate, dry film thickness 70um.
6, the theoretical amount: about 4.8 square meters / kg, (dry film 30um dollars).
7, overcoating interval: 25 ℃ 6 hours, the longest unlimited.
8, after supporting the use of paint: chlorosulfonated polyethylene topcoat.

Security:
1, the construction site should have good ventilation facilities.
2, construction workers should wear a mask, glasses, gloves and other protective equipment, to avoid skin contact and inhalation paint mist, solvent.
3, the construction site is strictly prohibited smoking, isolated from all sources of fire.

Guangzhou Wuyang paint Limited by Share Ltd (producer)
Add: room 135, 3 building, 520 Huang Yuan Road, Baiyun District, Guangdong, Guangzhou
Tel:020-86297777      Fax:020-86296432
E-mail:wuyang@wuyangpaint.com

Guangzhou Wuyang paint (Wengyuan) Co., Ltd. (production)
Add:Guangdong Wengyuan County of Wengyuan city in Shaoguan Province town of Huacai chemical paint City No. A-18

Tel:0751-2617111
E-mail:wuyang@wuyangpaint.com