Product family
Product family
/
/
/
/
Vinyl Phosphating Primer (Two Component)

Product Series

cp-4
cp-4

Vinyl Phosphating Primer (Two Component)

Product introduction: It is composed of two components, A and B. The A component is ground by polyvinyl butyral, anti-rust pigments, additives and solvents; the B component is a phosphating solution. Scope of application: Widely used for enhanced rust prevention of steel and non-ferrous metals, especially suitable for the protection of equipment and structures in oceans, humid and hot areas, etc. It can replace phosphating treatment for large components. But it can not replace the primer, other primer or anti-rust paint should be applied to have better effect. Packaging Specifications: Effective storage period: 12 months
Details

Product Features:

As a surface treatment agent for colored and ferrous metal bottom layers, the paint can act as a phosphating agent; the formed film (8-12 microns) firmly adheres to the metal surface, which can increase the adhesion between the organic coating and the metal surface.

 

Performance parameters:

1. Color and appearance: yellow-green translucent, smooth paint film

2. Non-volatile matter: ≥20%

3. Specific gravity: about 1.05kg/L

4. Drying time: dry ≤0.5 hours (under 25℃)

5. Adhesion: ≤Level 1

6. Flexibility: 1mm

7. Impact strength: 50kg•cm

8. Salt water resistance (3%NaCl, 3h): no foaming, no rusting, no falling off

 

Construction Instructions:

1. Surface treatment: sand blasting and shot blasting to remove scale, rust and oil, reaching Sa2.5 level or St3 level.

2. Substrate temperature: 3°C higher than the dew point.

3. Coating method: It can be brushed or sprayed.

4. Thinner: The special thinner for vinyl phosphating primer is adjusted to the appropriate viscosity for use.

5. Coating thickness: It is generally advisable to coat it once, and the dry film thickness is 10um.

6. Theoretical dosage: about 10㎡/kg, (calculated by dry film 10um).

7. Interval time of overcoating: 2 hours at 25℃, the longest can not exceed 1 day.

8. Back-end paint: epoxy series paint.

 

Security:

1. The construction site should have good ventilation facilities.

2. Construction workers should wear masks, glasses, gloves and other protective equipment to avoid skin contact and inhalation of paint mist and solvents.

3. Smoking is strictly prohibited at the construction site, and all sources of ignition are isolated.

There is currently no content to display
Please add data record on website background.
language
中国
韩国
韩国
韩国
韩国
韩国

Contact Us

WeChat public account QR code

WeChat

Follow us

Follow us

Headquarter:Address: Room 520, No. 135 (Building 3), Huangyuan Road, Baiyun District, Guangzhou City, Guangdong Province

Production base:No. A-18, Huacai Chemical Paint City, Wengcheng Town, Wengyuan County, Shaoguan City, Guangdong Province

Guangzhou Wuyang Paint Co., Ltd.    粤ICP备14047330号       Powered by:www.300.cn  SEOLabel