Product family
Product family

Product Series

cp-3
cp-3

Epoxy Zinc Rich Primer (Two-component)

Product introduction: It is prepared by dispersing epoxy resin, zinc powder, pigment, extender pigment, auxiliaries, polyamide and organic solvent. 5:1) composition of two-component primer. Scope of application: Suitable for oil pipelines, gas pipelines, shipbuilding, offshore platforms, marine structures, bridge metal structures, large-scale steel structures, heavy-duty anti-corrosion equipment, buried steel facilities, and oil storage tanks as anti-rust and anti-corrosion primers. Packaging Specifications: Effective storage period: 12 months
Details

Product Features:
The paint film has strong adhesion, hard rust prevention, cathodic protection, solvent resistance, good salt spray resistance, and strong chemical resistance. It is an excellent anti-rust and anti-corrosion primer.
 

Performance parameters:
1. Color and appearance: gray or light brown, smooth paint film
2. Drying time: surface dry ≤0.5h, hard dry ≤24h
3. Impact strength: ≥50kg•cm
4. Flexibility: 1mm
5. Adhesion (circle method): ≤Level 2
6. Resistance to 10% NaOH, 168h: no foaming, no falling off
7. Salt water resistance (immersed in 3%NaCl, 48h): no foaming, no rust
8. 1000h salt spray test: no rust, no fall off
 

Construction Instructions:
1. Surface treatment: sand blasting and shot blasting to remove oxide scale, rust and oil, up to Sa2.5 or St3.
2. Substrate temperature: 3°C higher than the dew point.
3. Coating method: brush, roller, spray, high pressure airless spray.
4. Thinner: The epoxy paint thinner is adjusted to the appropriate viscosity for use.
5. Coating thickness: Mix evenly according to the ratio of A and B, and apply after curing for 20 minutes. The dry film thickness is 20-30um.
6. Overcoating interval: about 12 hours at 25℃.
7. Subsequent paints: epoxy intermediate paint, top paint, chlorinated rubber, acrylic, polyurethane, vinyl paint.
 

Security:
1. The construction site should have good ventilation facilities.
2. Construction workers should wear masks, glasses, gloves and other protective equipment to avoid skin contact and inhalation of paint mist and solvents.
3. Smoking is strictly prohibited on the construction site, and all sources of ignition are isolated.

There is currently no content to display
Please add data record on website background.
language
中国
韩国
韩国
韩国
韩国
韩国

Contact Us

WeChat public account QR code

WeChat

Follow us

Follow us

Headquarter:Address: Room 520, No. 135 (Building 3), Huangyuan Road, Baiyun District, Guangzhou City, Guangdong Province

Production base:No. A-18, Huacai Chemical Paint City, Wengcheng Town, Wengyuan County, Shaoguan City, Guangdong Province

Guangzhou Wuyang Paint Co., Ltd.    粤ICP备14047330号       Powered by:www.300.cn  SEOLabel