Product Series
Water-based environmental protection wood semi-gloss finish
Performance parameters:
Paint film: smooth and smooth
Non-volatile matter: ≥30%
Drying time (25℃): surface dry ≤30min, hard dry ≤4h
Gloss (60°): 30~60
Hardness: ≥0.4
Adhesion: ≤Class 2
Product Features:
1. The construction is convenient and can be directly diluted with tap water;
2. Low odor, environmentally friendly product without solvent;
3. Does not contain toxic and harmful organic solvents, zero free TDI, and does not contain heavy metals such as lead, cadmium, and chromium;
4. Excellent temperature resistance and yellowing resistance, the paint film can withstand high temperature burning without foaming and peeling;
5. Outstanding stain-resistance performance, the pollution of daily oil, tea, sauce and vinegar can be wiped clean immediately;
6. High fullness, strong adhesion and smooth hand feeling;
7. It is resistant to ethanol wiping, the paint film is not easy to turn white and yellow, and there is no wrinkling and peeling phenomenon.
Construction Instructions:
1. Surface treatment
•Before painting, the surface of the wood must be dry, free of oil, dust and smooth; the moisture content of the wood should be less than 14%;
•When using on the old paint surface, it must first be sanded with 800 grit sandpaper to a smooth and uniform surface;
2. Construction conditions: when the ambient temperature is lower than 5℃ or the humidity is >80%, please do not construct;
3. Matching system: In order to achieve the best finishing effect, please use the company's water-based wood primer. Theoretically, it is recommended to apply the primer 1~2 times and the topcoat 2 times.
4. Construction method: brushing and spraying can be used. It is recommended to use the construction method of multiple thin coats, otherwise the drying speed and leveling will be affected;
5. Construction ratio: primer: clear water = 100: 5~20, top coat: clear water = 100: 5~20, stir evenly and let stand for 5~10 minutes until the bubbles disappear completely before construction;
6. Recoating interval: Generally, the recoating interval is >2h, and the actual drying time will vary with the ambient temperature and humidity. After the interlayer is dry, it needs to be smoothed with 800-grit sandpaper before the next paint construction;
7. Theoretical paint quantity: primer 8~10㎡/kg, topcoat 10~12㎡/kg;
Notes:
1. This product is a water-based product, it is strictly forbidden to mix it with oily substances and other paints;
2. Please do not superimpose immediately the sheets that are not dry after construction, so as to avoid the adhesion of the paint film. The curing period of the paint film is 7 days;
3. The transportation and storage temperature should be kept at 0~35℃, and avoid direct sunlight exposure.